Sunday, December 11, 2011

Challenge progress

Less than a month to go and it's my busiest month for work. Which means I'm going to have to admit I'm not going to make my challenge goal. Sigh. At least not to have completed quilts.

I've kind of revamped my goal to just be to finish the quilt tops at this point. Almost. I think I can get that done with the exception of two of the hand applique ones. And I have all the batting I need to finish everything off as soon as I find some time to get them basted. I'm sitting here with 10 or so completed tops, three more almost done and three others to be sewn. So it's entirely possible to make it at least this far to the goal by the end of the year.

A stack of completed quilt tops and shots of them in progress. My design wall has been getting quite crowded of late with at least three quilts going at any one time.






Disclosure of Material Connection: Some of the links in the post above are affiliate links. This means if you click on the link and purchase the item, I will receive an affiliate commission, probably enough to get a stick of gum. I generally only recommend products or services on this blog that I would use personally and believe you will find cool as well. I am disclosing this in accordance with the Federal Trade Commission’s 16 CFR, Part 255: “Guides Concerning the Use of Endorsements and Testimonials in Advertising.”

0 comments: